Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO

2013 ◽  
Vol 68 (5-8) ◽  
pp. 1401-1416 ◽  
Author(s):  
S. Dousthaghi ◽  
R. Tavakkoli-Moghaddam ◽  
A. Makui
Sign in / Sign up

Export Citation Format

Share Document