An alternative for improving setup times and time between failures aiming at manufacturing lead time reduction
2020 ◽
Vol 998
◽
pp. 012027
2003 ◽
Vol 41
(3)
◽
pp. 571-579
◽
Keyword(s):
Keyword(s):
2017 ◽
Vol 11
(2/3)
◽
pp. 264
◽
2020 ◽
Vol ahead-of-print
(ahead-of-print)
◽
2011 ◽
Vol 211
(2)
◽
pp. 274-281
◽
Keyword(s):