Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
2018 ◽
Vol 37
(5)
◽
pp. 6774-6794
◽
Keyword(s):
No Wait
◽
2013 ◽
Vol 64
(4)
◽
pp. 902-916
◽
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
2007 ◽
Vol 2
(2)
◽
pp. 135
◽
Keyword(s):
2010 ◽
Vol 60
(5)
◽
pp. 1374-1384
◽
2008 ◽
Vol 35
(9)
◽
pp. 2807-2839
◽
2013 ◽
Vol 70
(9-12)
◽
pp. 1591-1601
◽
2013 ◽
Vol 37
(12-13)
◽
pp. 7164-7173
◽
Keyword(s):
1993 ◽
pp. 336-352
◽