total tardiness
Recently Published Documents


TOTAL DOCUMENTS

353
(FIVE YEARS 53)

H-INDEX

40
(FIVE YEARS 5)

Author(s):  
Julio Mar-Ortiz ◽  
Alex J. Ruiz Torres ◽  
Belarmino Adenso-Díaz

AbstractThis paper explores the characteristics of solutions when scheduling jobs in a shop with parallel machines. Three classical objective functions were considered: makespan, total completion time, and total tardiness. These three criteria were combined in pairs, resulting in three bi-objective formulations. These formulations were solved using the ε-constraint method to obtain a Pareto frontier for each pair. The objective of the research is to evaluate the Pareto set of efficient schedules to characterize the solution sets. The characterization of the solutions sets is based on two performance metrics: the span of the objective functions' values for the points in the frontier and their closeness to the ideal point. Results that consider four experimental factors indicate that when the makespan is one of the objective functions, the range of the processing times among jobs has a significant influence on the characteristics of the Pareto frontier. Simultaneously, the slack of due dates is the most relevant factor when total tardiness is considered.


2022 ◽  
Vol 13 (2) ◽  
pp. 223-236 ◽  
Author(s):  
Massimo Pinto Antonioli ◽  
Carlos Diego Rodrigues ◽  
Bruno de Athayde Prata

This paper aims at presenting a customer order scheduling environment in which the setup times are explicit and depend on the production sequence. The considered objective function is the total tardiness minimization. Since the variant under study is NP-hard, we propose a mixed-integer linear programming (MILP) model, an adaptation of the Order-Scheduling Modified Due-Date heuristic (OMDD) (referred to as Order-Scheduling Modified Due-Date Setup (OMMD-S)), an adaptation of the Framinan and Perez-Gonzalez heuristic (FP) (hereinafter referred to as Framinan and Perez-Gonzalez Setup (FP-S)), a matheuristic with Same Permutation in All Machines (SPAM), and the hybrid matheuristic SPAM-SJPO based on Job-Position Oscillation (JPO). The algorithms under comparison have been compared on an extensive benchmark of randomly generated test instances, considering two performance measures: Relative Deviation Index (RDI) and Success Rate (SR). For the small-size evaluated instances, the SPAM is the most efficient algorithm, presenting the better values of RDI and SR. For the large-size evaluated instances, the hybrid matheuristic SPAM-JPO and MILP model are the most efficient methods.


Author(s):  
Ali Allahverdi ◽  
Harun Aydilek ◽  
Asiye Aydilek

We consider a no-wait m-machine flowshop scheduling problem which is common in different manufacturing industries such as steel, pharmaceutical, and chemical. The objective is to minimize total tardiness since it minimizes penalty costs and loss of customer goodwill. We also consider the performance measure of total completion time which is significant in environments where reducing holding cost is important. We consider both performance measures with the objective of minimizing total tardiness subject to the constraint that total completion time is bounded. Given that the problem is NP-hard, we propose an algorithm. We conduct extensive computational experiments to compare the performance of the proposed algorithm with those of three well performing benchmark algorithms in the literature. Computational results indicate that the proposed algorithm reduces the error of the best existing benchmark algorithm by 88% under the same CPU times. The results are confirmed by extensive statistical analysis. Specifically, ANOVA analysis is conducted to justify the difference between the performances of the algorithms, and a test of hypothesis is performed to justify that the proposed algorithm is significantly better than the best existing benchmark algorithm with a significance level of 0.01.


Author(s):  
Xiao Wu ◽  
Peng Guo ◽  
Yi Wang ◽  
Yakun Wang

AbstractIn this paper, an identical parallel machine scheduling problem with step-deteriorating jobs is considered to minimize the weighted sum of tardiness cost and extra energy consumption cost. In particular, the actual processing time of a job is assumed to be a step function of its starting time and its deteriorating threshold. When the starting time of a job is later than its deteriorating threshold, the job faces two choices: (1) maintaining its status in holding equipment and being processed with a base processing time and (2) consuming an extra penalty time to finish its processing. The two work patterns need different amounts of energy consumption. To implement energy-efficient scheduling, the selection of the pre-processing patterns must be carefully considered. In this paper, a mixed integer linear programming (MILP) model is proposed to minimize the total tardiness cost and the extra energy cost. Decomposition approaches based on logic-based Benders decomposition (LBBD) are developed by reformulating the studied problem into a master problem and some independent sub-problems. The master problem is relaxed by only making assignment decisions. The sub-problems are to find optimal schedules in the job-to-machine assignments given by the master problem. Moreover, MILP and heuristic based on Tabu search are used to solve the sub-problems. To evaluate the performance of our methods, three groups of test instances were generated inspired by both real-world applications and benchmarks from the literature. The computational results demonstrate that the proposed decomposition approaches can compute competitive schedules for medium- and large-size problems in terms of solution quality. In particular, the LBBD with Tabu search performs the best among the suggested four methods.


Author(s):  
Vadim V. Romanuke

Background. In preemptive job scheduling, which is a part of the flow-shop sequencing tasks, one of the most crucial goals is to obtain a schedule whose total tardiness would be minimal. Total tardiness minimization is commonly reduced to solving a combinatorial problem which becomes practically intractable as the number of jobs and the numbers of their processing periods increase. To cope with this challenge, heuristics are used. A heuristic, in which the decisive ratio is the reciprocal of the maximum of a pair of the remaining processing period and remaining available period, is closely the best one. However, the heuristic may produce schedules of a few jobs whose total tardiness is 25 % greater than the minimum or even worse. Therefore, this heuristic needs a corrective branch which would further try to minimize total tardiness under certain conditions. Objective. The goal is to ascertain what is to be corrected in the heuristic so that the total tardiness value could be obtained lesser. The heuristic will be applied to tight-tardy progressive idling-free 1-machine preemptive scheduling, where the release dates are given in ascending order starting from 1 to the number of jobs, and the due dates are tightly set after the release dates. In this scheduling problem, the inaccuracy of finding the minimal total tardiness has the strongest negative impact, so this is almost the worst case, which defines the accuracy limit of the heuristic and positively serves just as the principle of minimax guaranteeing decreasing losses in the worst conditions. Methods. The heuristic sorts maximal decisive ratios by release dates, where the scheduling preference is given to the earliest job. To achieve the said goal, three other sorting approaches are presented and a computational study is carried out with applying each of the four heuristic approaches to minimize total tardiness. For this, two series of 266000 and 1064000 scheduling problems are generated. Results. The earliest-job sorting ensures a heuristically minimal total tardiness value in more than 97.6 % of scheduling problems, but it fails to minimize total tardiness in no less than 2.2 % of the cases. Nevertheless, a sorting approach with minimizing remaining processing periods produces a heuristically minimal total tardiness for almost any scheduling problem. If an exception occurs, this sorting approach “loses” to the other sorting approaches very little. Moreover, the exceptions are quite rare as it has been registered just a one scheduling problem (out of 31914 cases followed by a sole “win” of a heuristic version) whose minimal total tardiness is achieved by the earliest-job sorting. Conclusions. The best heuristic version is that one which uses the sorting approach with minimizing remaining processing periods. This, however, is confirmed only for the case where jobs do not have any priorities. The case when jobs have their priority weights is to be yet analyzed.


Sign in / Sign up

Export Citation Format

Share Document