Strata Stability Investigation and Convergence Monitoring (SSICM) in Thick-Seam Depillaring with Caving by Cable Bolting Method
2016 ◽
Vol 10
(10)
◽
pp. 1-8
Keyword(s):
Keyword(s):
2017 ◽
Vol 32
(2)
◽
pp. 458-470
◽
2021 ◽
Vol 621
◽
pp. 012029
2012 ◽
Vol 46
(5)
◽
pp. 761-781
◽
2015 ◽
Vol 17
(6)
◽
pp. 4231-4236
◽
2018 ◽
Vol 35
(7)
◽
pp. 565-572
◽