Project scheduling problem with stochastic activity duration times

2005 ◽  
Vol 168 (1) ◽  
pp. 342-353 ◽  
Author(s):  
Hua Ke ◽  
Baoding Liu
2013 ◽  
Vol 483 ◽  
pp. 607-610 ◽  
Author(s):  
Chun Jie Zhong ◽  
Ying Yu ◽  
Yun Lang Jia

A resource-constrained project scheduling problem with stochastic resource-dependent activity durations is presented in this paper,and the two-point method is employed to simulate the uncertain property.Furthermore a genetic algorithm combined with this method is provided to solve the problem. Compared with the results from the genetic with Monte Carlo simulation, the proposed method is verified to be effective and more efficient.


2018 ◽  
Vol 8 (1) ◽  
pp. 100-109 ◽  
Author(s):  
Naiming Xie

Purpose The purpose of this paper is to combine the interval grey number algorithm with a project scheduling model, so as to solve the interval grey number based project scheduling problem. Design/methodology/approach According to the grey system theory, if we could not clearly collect the right value of an activity while obtaining the upper and lower boundaries of the activity duration time, we can find activity duration time as interval grey number. This paper tries to combine interval grey number with project scheduling problem. The general definition of interval grey number was given. And then the linear operations of independent interval grey number and non-independent interval grey number were further defined. Interval grey number based project scheduling model and its algorithm were further proposed. Finally, a numerical case was adopted to test the effectiveness of the proposed method. Findings The results show that grey project scheduling and grey critical path method could be established under interval grey number measured activities. Practical implications Scheduling problem was widely used in project planning and control. This manuscript attempted to combine interval grey number with project scheduling so as to explain the flexible deadline in a special project. It is truly in accordance with the requirements for real applications. Originality/value This paper proposed linear operations of independent and non-independent interval grey numbers, and proposed a interval grey number based project scheduling model. Valuable contribution is to combine interval grey numbers with project scheduling and it is meaningful to make a useful strategy in a flexible condition of project scheduling.


Sign in / Sign up

Export Citation Format

Share Document