Off-design performance and an optimal operation strategy for the multistage compression process in adiabatic compressed air energy storage systems

2019 ◽  
Vol 149 ◽  
pp. 262-274 ◽  
Author(s):  
Huan Guo ◽  
Yujie Xu ◽  
Yi Zhang ◽  
Qi Liang ◽  
Hongtao Tang ◽  
...  
Author(s):  
Robert Schainker ◽  
Michael Nakhamkin ◽  
John R. Stange ◽  
Louis F. Giannuzzi

Results of engineering and optimization of 25 MW and 50 MW turbomachinery trains for compressed air energy storage (CAES) power plant application are presented. Submitted by equipment suppliers, proposals are based on the commercially available equipment. Performance data and budget prices indicate that the CAES power plant is one of the most cost effective sources of providing peaking power and load management.


Sign in / Sign up

Export Citation Format

Share Document