A two-stage robust optimization approach for the mobile facility fleet sizing and routing problem under uncertainty
2016 ◽
Vol 67
◽
pp. 75-89
◽
Keyword(s):
2017 ◽
Vol 260
(1)
◽
pp. 21-40
◽
Keyword(s):
2020 ◽
Vol 8
(2)
◽
pp. 141-172
◽
2016 ◽
Vol 85
◽
pp. 40-51
◽
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
2020 ◽
Vol 136
◽
pp. 101888
◽
Keyword(s):