From supervisory control to PLC code: a way to speed-up Constructive/Virtual Commissioning of Manufacturing Systems
1993 ◽
Vol 8
(4)
◽
pp. 200-209
◽
Keyword(s):
1988 ◽
Vol 15
(1)
◽
pp. 313-335
◽
1996 ◽
Vol 3
(4)
◽
pp. 255-267
◽
2013 ◽
Vol 52
(6)
◽
pp. 1573-1591
◽