A multi-objective resilience-economic stochastic scheduling method for microgrid

Author(s):  
Abdollah Younesi ◽  
Hossein Shayeghi ◽  
Pierluigi Siano ◽  
Amin Safari
2011 ◽  
Vol 328-330 ◽  
pp. 41-47
Author(s):  
Shi Long Wang ◽  
Heng Zhou ◽  
Jie Zhou ◽  
Rui Tang

Combining with the actual production case, a multi-objective optimization rescheduling problem about that multiple products with various manufacturing processes in auto-production line aiming at a single hoist production in sequence where a new product is inserted is studied. Mathematical model and algorithm with a new stochastic scheduling method are proposed in fully consideration of the equipment (tank) and constraint of manufacture process. The model and algorithm which have been used in auto-production line of a surface treatment over half a year can meet the practical production requirements.


IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 65085-65095
Author(s):  
Ming Yang ◽  
Hao Ma ◽  
Shuang Wei ◽  
You Zeng ◽  
Yefeng Chen ◽  
...  

IEEE Access ◽  
2017 ◽  
Vol 5 ◽  
pp. 22067-22080 ◽  
Author(s):  
Liyun Zuo ◽  
Lei Shu ◽  
Shoubin Dong ◽  
Yuanfang Chen ◽  
Li Yan

Sign in / Sign up

Export Citation Format

Share Document