Deterministic and stochastic model based run-to-run control for batch processes with measurement delays of uncertain duration
2012 ◽
Vol 22
(2)
◽
pp. 508-517
◽
2000 ◽
Vol 10
(4)
◽
pp. 317-332
◽
2000 ◽
Vol 45
(10)
◽
pp. 1928-1932
◽
2018 ◽
Vol 57
(51)
◽
pp. 17437-17451
◽
2019 ◽
Vol 217
(1-2)
◽
pp. 1-34
◽
Keyword(s):
2009 ◽
Vol 33
(5)
◽
pp. 992-1003
◽
Keyword(s):