scholarly journals Success Factors for Business Process Improvement Projects in Small and Medium Sized Enterprises – Empirical Evidence

2017 ◽  
Vol 121 ◽  
pp. 439-445 ◽  
Author(s):  
Patrick Lückmann ◽  
Carsten Feldmann
2008 ◽  
Vol 14 (6) ◽  
pp. 778-802 ◽  
Author(s):  
Samia M. Siha ◽  
Germaine H. Saad

PurposeThe purpose of this paper is to survey and analyze current process improvement (PI) approaches, their empirical results reported in the literature, and develop accordingly a conceptual framework and implementation guidelines.Design/methodology/approachA literature review of the popular business database to search for case studies and empirical research on PI methods was conducted. The empirical evidence on success and failure factors were inferred and tabulated. Based on synthesis of the lessons learned from this empirical evidence along with concepts drawn from economics, and operations management, a conceptual framework is developed.FindingsIt was found that the framework would serve as a diagnostic tool for identification of, and recovering from root causes of problems and inefficiencies faced in business environments. The framework proposed synthesizes and extends earlier PI tools and basic approaches used for mitigating disruptions faced in operations practice. The framework design consists of three main phases: Specify; Analyze; and Monitor closely. Accordingly, it is denoted by SAM.Practical implicationsDecision makers can be altered to both the success factors and causes of failure of different PI approaches, and a framework is provided along with implementation guidelines that help assure practical effectiveness of PI efforts. The guidelines provided for practicing managers comprise two categories: specific; tool‐based, and general; system‐based.Originality/valueThe contribution of this paper is two fold: first, empirical evidence on the drivers of success and failure of four main PI approaches, were synthesized. These include: six sigma, benchmarking, reengineering and process mapping. Second, based on this empirical evidence, a conceptual framework that guides both the choice and implementation of business process improvement programs is developed. The proposed framework and its implementation guidelines help assure actual effectiveness of PI practice.


2019 ◽  
Vol 23 (1) ◽  
pp. 36-48
Author(s):  
Jason M. Casebolt ◽  
Ahmad Jbara ◽  
Dov Dori

2016 ◽  
Vol 22 (6) ◽  
pp. 1099-1117 ◽  
Author(s):  
Boyd A. Nicholds ◽  
John P.T. Mo

Purpose The research indicates there is a positive link between the improvement capability of an organisation and the intensity of effort applied to a business process improvement (BPI) project or initiative. While a degree of stochastic variation in applied effort to any particular improvement project may be expected there is a clear need to quantify the causal relationship, to assist management decision, and to enhance the chance of achieving and sustaining the expected improvement targets. The paper aims to discuss these issues. Design/methodology/approach The paper presents a method to obtain the function that estimates the range of applicable effort an organisation can expect to be able to apply based on their current improvement capability. The method used analysed published data as well as regression analysis of new data points obtained from completed process improvement projects. Findings The level of effort available to be applied to a process improvement project can be expressed as a regression function expressing the possible range of achievable BPI performance within 90 per cent confidence limits. Research limitations/implications The data set applied by this research is limited due to constraints during the research project. A more accurate function can be obtained with more industry data. Practical implications When the described function is combined with a separate non-linear function of performance gain vs effort a model of performance gain for a process improvement project as a function of organisational improvement capability is obtained. The probability of success in achieving performance targets may be estimated for a process improvement project. Originality/value The method developed in this research is novel and unique and has the potential to be applied to assessing an organisation’s capability to manage change.


Sign in / Sign up

Export Citation Format

Share Document