Single-machine-based joint optimization of predictive maintenance planning and production scheduling
2018 ◽
Vol 51
◽
pp. 238-247
◽
Keyword(s):
Single-machine-based joint optimization of predictive maintenance planning and production scheduling
2019 ◽
Vol 55
◽
pp. 173-182
◽
Keyword(s):
2005 ◽
Vol 56
(2)
◽
pp. 161-168
◽
Keyword(s):
2015 ◽
Vol 2015
◽
pp. 1-9
◽
Keyword(s):
2007 ◽
Vol 54
(6)
◽
pp. 602-614
◽
2005 ◽
Vol 54
(2)
◽
pp. 304-309
◽
2011 ◽
Vol 61
(4)
◽
pp. 1098-1106
◽
Keyword(s):
2013 ◽
Vol 51
(3)
◽
pp. 847-868
◽
2014 ◽
Vol 47
(3)
◽
pp. 8042-8047
◽
2010 ◽
Vol 50
(1-4)
◽
pp. 365-375
◽
Keyword(s):