Tracking the association between metro-railway construction works and PM levels in an urban Mediterranean environment

2016 ◽  
Vol 568 ◽  
pp. 1326-1332 ◽  
Author(s):  
A.K. Paschalidou ◽  
P.A. Kassomenos ◽  
A. Kelessis
2019 ◽  
Vol 53 (2) ◽  
pp. 290-297 ◽  
Author(s):  
L. Pando ◽  
L. M. Díaz-Díaz ◽  
D. Arias ◽  
C. Castañón ◽  
C. López-Fernández

2012 ◽  
Vol 32 (5) ◽  
pp. 920-924 ◽  
Author(s):  
Ana de Guzmán Báez ◽  
Paola Villoria Sáez ◽  
Mercedes del Río Merino ◽  
Justo García Navarro

2020 ◽  
Vol 10 (1) ◽  
pp. 846-853
Author(s):  
Agnieszka Leśniak ◽  
Filip Janowiec

AbstractThe beginning of each construction investment is preceded by proper preparation. In the case of public procurement, this usually involves conducting a tender procedure to select a contractor for the works.Railway construction works require this rigor. This article will provide an overview of railway construction investments planned to be implemented in the current EU financial perspective. The key elements of the tender process related to individual stages of the tender will be analyzed.


2003 ◽  
pp. 68-80
Author(s):  
A. Dementiev ◽  
A. Zolotareva ◽  
A. Reus

The most important measures stimulating the increase of efficiency and effectiveness of budget expenditures on road construction are the improvement of pricing mechanisms and increasing efficiency of the procedures of government purchases of goods, works and services. The paper includes the analysis of main problems that arise in the process of government purchases and construction pricing with the reference to budget expenditure on road construction. It includes the review and analysis of international experience and possible measures of increasing the efficiency and effectiveness of government purchases and (road) construction pricing in Russia.


Sign in / Sign up

Export Citation Format

Share Document