Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness

Author(s):  
Karam Allali ◽  
Said Aqil ◽  
Jabrane Belabid
2011 ◽  
Vol 339 ◽  
pp. 332-335 ◽  
Author(s):  
Parinya Kaweegitbundit

This paper considers flow shop scheduling problems with sequence dependent setup time. The makespan criterion has been considered. In this paper presented a comparison of three heuristics for solves this problem. The memetic algorithm, genetic algorithm and NEH heuristic have been compared. In the experimental, the result from memetic algorithm is maximum the best solution. Therefore, the MA heuristic outperforms other heuristic.


Sign in / Sign up

Export Citation Format

Share Document