An improved algorithm for a two-stage production scheduling problem with an outsourcing option
Keyword(s):
2021 ◽
Vol 127
◽
pp. 106659
Keyword(s):
2012 ◽
Vol 271-272
◽
pp. 650-656
2019 ◽
Vol 104
◽
pp. 37-48
◽
2009 ◽
Vol 36
(5)
◽
pp. 9506-9512
◽
2010 ◽
Vol 37
(5)
◽
pp. 960-969
◽
Keyword(s):
2017 ◽
Vol 7
(4)
◽
pp. 224-235
◽