Parker Gas Turbine Filtration invests in Middle East

2017 ◽  
Vol 2017 (11) ◽  
pp. 14
Keyword(s):  
Author(s):  
H. Saadawi

Specifying and selecting equipment for gas compression projects is a complex process involving many engineering disciplines. All the alternatives and the possible interaction between the various components in the system should be carefully examined by the project team. The accumulation of errors in evaluating the system characteristics during the project engineering phase, can lead to the gas compression system not performing to design specifications. This paper describes the problems encountered with the compressor package during the commissioning of four gas turbine-driven compressor stations for gas lift in one of the onshore oilfields in the Middle East. Solutions to these problems are also outlined.


Author(s):  
Patrick J. Norris ◽  
John Cunningham

Kuwait Oil Company (KOC) has installed and operated gas turbines since 1957. There are currently 79 Gas Turbines ranging in size from 700 to 33,000 H.P. of various types, from industrial to aero-derivative. Gas turbines provide more than half a million in horsepower, which is more than 80% of the power, for machinery and power generation at KOC. This paper covers the introduction and the rappid growth of gas turbine power at KOC. Operational sites at KOC are subject to severe heat, dust and humidity. The experience in the operation and maintenance in the early years of the gas turbines at KOC are described. Gas turbines have played a major role in the success of the Company.


Sign in / Sign up

Export Citation Format

Share Document