Research on the Whole Process Cost Risk Evaluation Index System of Real Estate Park
Keyword(s):
The development focus of real estate enterprises has shifted from traditional buildings to industrial park construction. After summarizing and analyzing the risk factors of the traditional construction cost, the WBS-CBS-RBS method is used to classify and identify the whole process cost of the industrial park. Finally, eight first level evaluation indexes and 37 second level evaluation indexes are established to form the whole process cost risk evaluation index system of the industrial park construction, which provides the basis for the whole process cost risk assessment of the subsequent industrial park construction.
Keyword(s):
Keyword(s):
2021 ◽
Vol 1744
(3)
◽
pp. 032035
2015 ◽
Vol 742
◽
pp. 683-687
◽
2017 ◽
Vol 05
(07)
◽
pp. 352-369
◽
Keyword(s):
Keyword(s):