Modeling and Control of Oxygen Transfer in High Purity Oxygen Activated Sludge Process

2003 ◽  
Vol 129 (5) ◽  
pp. 402-411 ◽  
Author(s):  
Chwen-Jeng Tzeng ◽  
Reza Iranpour ◽  
Michael K. Stenstrom
1998 ◽  
Vol 37 (12) ◽  
pp. 149-156 ◽  
Author(s):  
Carl-Fredrik Lindberg

This paper contains two contributions. First it is shown, in a simulation study using the IAWQ model, that a linear multivariable time-invariant state-space model can be used to predict the ammonium and nitrate concentration in the last aerated zone in a pre-denitrifying activated sludge process. Secondly, using the estimated linear model, a multivariable linear quadratic (LQ) controller is designed and used to control the ammonium and nitrate concentration.


1989 ◽  
Vol 21 (10-11) ◽  
pp. 1161-1172 ◽  
Author(s):  
M. Hiraoka ◽  
K. Tsumura

The authors have been developing a hierarchical control system for the activated sludge process which consists of an upper level system controlling long-term seasonal variations, a control system of intermediate level aiming at optimization of the process and a control system of lower level controlling diurnal changes or hourly fluctuations. The control system using the multi-variable statistical model is one of the most appropriate control systems based on the modern control theory, for applying the lower level control of the activated sludge process. This paper introduces our efforts for developing the reliable data acquisition system, the control experiments applying the AR-model, one of the statistical models which were conducted at a pilot plant and present studies on the system identification and control at a field sewage treatment plant.


1993 ◽  
Vol 28 (11-12) ◽  
pp. 163-171 ◽  
Author(s):  
Weibo (Weber) Yuan ◽  
David Okrent ◽  
Michael K. Stenstrom

A model calibration algorithm is developed for the high-purity oxygen activated sludge process (HPO-ASP). The algorithm is evaluated under different conditions to determine the effect of the following factors on the performance of the algorithm: data quality, number of observations, and number of parameters to be estimated. The process model used in this investigation is the first HPO-ASP model based upon the IAWQ (formerly IAWPRC) Activated Sludge Model No. 1. The objective function is formulated as a relative least-squares function and the non-linear, constrained minimization problem is solved by the Complex method. The stoichiometric and kinetic coefficients of the IAWQ activated sludge model are the parameters focused on in this investigation. Observations used are generated numerically but are made close to the observations from a full-scale high-purity oxygen treatment plant. The calibration algorithm is capable of correctly estimating model parameters even if the observations are severely noise-corrupted. The accuracy of estimation deteriorates gradually with the increase of observation errors. The accuracy of calibration improves when the number of observations (n) increases, but the improvement becomes insignificant when n>96. It is also found that there exists an optimal number of parameters that can be rigorously estimated from a given set of information/data. A sensitivity analysis is conducted to determine what parameters to estimate and to evaluate the potential benefits resulted from collecting additional measurements.


AIChE Journal ◽  
1984 ◽  
Vol 30 (3) ◽  
pp. 368-376 ◽  
Author(s):  
Takeichiro Takamatsu ◽  
Suteaki Shioya ◽  
Hirokazu Kurome

Author(s):  
T. Bremm ◽  
B. Rossati ◽  
J. Viveiros ◽  
L. Fernandes ◽  
T. Braga ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document