Discussion of “Beam-To-Column Moment Connections”

1980 ◽  
Vol 106 (12) ◽  
pp. 2573-2574
Author(s):  
Natarajan Krishnamurthy
Keyword(s):  
2019 ◽  
Vol 19 (6) ◽  
pp. 1767-1784 ◽  
Author(s):  
Masoud Hoseinzadeh Asl ◽  
Mahsa Saeidzadeh ◽  
Seyedbabak Momenzadeh

2021 ◽  
Vol 33 (6) ◽  
pp. 403-411
Author(s):  
Kyungkoo Lee ◽  
Jooho Jin ◽  
Jinwon Shin ◽  
Heesun Seo ◽  
Kooyun Park

2015 ◽  
pp. 549-556
Author(s):  
D Wei ◽  
J McCormick ◽  
M Hartigan ◽  
M Fadden

1991 ◽  
Vol 18 (4) ◽  
pp. 690-710
Author(s):  
Hany Ahmed El-Ghazaly ◽  
Heyad Saud Al-Zamel

A new detail is introduced for precast concrete beam-to-column moment connections. The detail consists of a connecting steel frame used to mechanically connect the threaded end protruding reinforcing bars from beam and column. The connection detail is made convenient to assemble where the erection method resembles that of steel construction. No idle crane time is necessary, since the connecting steel frame is designed to carry the beam's own weight. When the connection construction is completed, the joint functions as a moment resisting hard connection. The experimental testing program involved testing of twelve full-scale specimens in addition to a pilot test. Of the twelve tests seven are flexural tests, three are shear tests, and two are monolithic flexural tests for comparison. Modes of failure in the flexural tests were mainly due to rupture of tension reinforcement; however, premature slippage of the rebars may occur under certain conditions, but could be conveniently prevented. In the shear tests, diagonal tension crack failure predominated. If the connection parameters are properly selected, the connection will be capable of developing the beam's full plastic moment and undergo sufficient rotation before collapse. Key words: precast concrete, moment connections, connecting steel frame, stiffness, strength, ductility.


Sign in / Sign up

Export Citation Format

Share Document