An integrated production and maintenance planning model with time windows and shortage cost
2010 ◽
Vol 49
(8)
◽
pp. 2265-2283
◽
Keyword(s):
Keyword(s):
2009 ◽
Vol 42
(4)
◽
pp. 822-827
◽
Keyword(s):
2015 ◽
Vol 17
(2)
◽
pp. 215-221
◽
Keyword(s):
2007 ◽
Vol 181
(2)
◽
pp. 679-685
◽
2018 ◽
Vol 118
◽
pp. 89-103
◽
2019 ◽
Vol 50
◽
pp. 263-277
◽
Keyword(s):
Keyword(s):
2017 ◽
Vol 73
(4)
◽
pp. I_142-I_152