Prediction of oil well production based on the time series model of optimized recursive neural network

Author(s):  
Yuefei Cheng ◽  
Yang Yang
2014 ◽  
Vol 631-632 ◽  
pp. 543-547 ◽  
Author(s):  
Long Long Feng ◽  
Xing Li

The deformation monitoring data of the dam has the typical characters of instability and nonlinearity after being completed and impounding water. To solve the problems, this paper introduces the time series model and BP neural network model to analysis the dam monitoring data. Firstly, time series model was applied to fit and predict and then used the BP neural network model to correct the nonlinear part of residuals. Finally, we can get a series of fitting and predictive value of the monitoring data by combining of above both models. Taking the certain radial displacement value of a measuring point of a certain dam as an example, ARIMA-BP model was established to analyze the data. The result shows: fitting and predictive accuracy of ARIMA-BP model is relatively high and closed to the measured value.


2015 ◽  
pp. 151-172
Author(s):  
Henry Daniel Hernández Martínez ◽  
◽  
Diego Fernando Lemus Polanía ◽  

2021 ◽  
Author(s):  
Arinjita Bhattacharyya ◽  
Swarup Chattopadhyay ◽  
Monalisha Pattnaik ◽  
Tanujit Chakraborty

Sign in / Sign up

Export Citation Format

Share Document