An optimal production scheduling under random selection within multi-objective based on batch movement and asymmetrical setup time

2018 ◽  
Vol 35 (8) ◽  
pp. 506-525
Author(s):  
Yun-Cheng Huang ◽  
Yi-An Ding ◽  
Xin-Yi Chang
Sign in / Sign up

Export Citation Format

Share Document