An optimal production scheduling under random selection within multi-objective based on batch movement and asymmetrical setup time
2018 ◽
Vol 35
(8)
◽
pp. 506-525
Keyword(s):
2019 ◽
Vol 139
(12)
◽
pp. 1005-1014
2020 ◽
Vol 268
◽
pp. 121540
◽
Keyword(s):
2009 ◽
Vol 3
(1)
◽
pp. 36-46
◽
Keyword(s):
2001 ◽
Vol 46
(2)
◽
pp. 209-231
◽
2007 ◽
Vol 45
(12)
◽
pp. 2629-2653
◽