scholarly journals Risk assestment of housing reconstruction project community-based construction after the earthquake

2019 ◽  
Vol 1339 ◽  
pp. 012001
Author(s):  
Wendi Boy ◽  
Rafki Imani ◽  
Mayozi Chari ◽  
Widiawati Purba ◽  
Jihan Melasari
Author(s):  
Taufika Ophiyandri ◽  
Dilanthi Amaratunga ◽  
Kaushal Keraminiyage

Purpose The purpose of this paper is to discuss the advantages and limitations of the implementation of a community-based method in post-disaster housing reconstruction. Design/methodology/approach The research was based on multiple case studies in the implementation of a community-based post-disaster housing reconstruction project (CPHRP) in Indonesia. Data were gathered by conducting semi-structured interviews and a questionnaire survey. Findings The research reveals 22 advantages of a CPHRP. Four advantages can be categorised as highly significant. They are create sense of ownership, fit to local culture/customs/wisdom, build beneficiaries’ confidence and minimize corruption. There are some advantages that cannot be delivered if the housing reconstruction is conducted using a contractor-based approach. It was also found that psychological advantages are more dominant than the physical advantages. Despite its numerous advantages, CPHRP has limitations. First, it requires a long pre-construction process and, second, there is a limitation with regard to the capacity of implementer and there are limitations within the community itself. Originality/value This paper is very specific because it attempts to discover the advantages and limitations of a CPHRP.


2017 ◽  
Vol 15 ◽  
Author(s):  
Noman Ahmed

Regions affected by conflict and violence become difficult locations for undertaking routine management and rebuilding. However conditions often arise where input from various stakeholders for relief, rehabilitation and institutional re-vamping become unavoidable. Research and experiences from different contexts inform that outcomes of such interventions have varied results due to unpredictability of contextual conditions, approaches and methodologies adopted for planning and implementations, capacity of personnel involved, available resources and interests of concerned institutions. Awaran district in Balochistan has been impacted by conflict and violence for many years. The impoverished region, apart from social and political turbulence, is recovering from a devastating earthquake that struck the district in September 2013. This paper examines two development interventions in the region; one undertaken by the district administration to streamline the development work through a state sponsored housing reconstruction project and the other by Urban Resource Centre (URC) in collaboration with local communities. Field research for this paper was done during 2014-2015 and comprised review of records, informal discussions with government staff, military officers, community members and working staff of NGOs in the area. After analysing the key findings of these two initiatives, it was found that government sponsored housing reconstruction projects experienced limited success due to usual bureaucratic hurdles and political uncertainties. The community led initiatives were more effective, simple and easy to apply.


2018 ◽  
Vol 192 ◽  
pp. 02066
Author(s):  
Bee Lan Oo ◽  
Riza Sunindijo ◽  
Fatma Lestari

An objective evaluation of users’ long-term satisfaction with the post-disaster permanent housing provided is important for judging the successes or failures of housing reconstruction programs. Focussing on four resettlement sites built via the REKOMPAK program after the 2010 Merapi eruption, this paper examines the users’ long-term satisfaction with the provided housing, and explores how their satisfaction level relates to their demographic characteristics and level of participation in the reconstruction processes. The results show that the households are in overall satisfied with the present housing. Their overall satisfaction level is statistically positively associated with household income, but not their level of participation and other demographic characteristics. These findings provide evidence on a satisfactory outcome in the long-term for the REKOMPAK, a community-based reconstruction program that was implemented in Indonesia since 2004, and a useful insight for local authorities, humanitarian and other agencies involved in post-disaster reconstruction program.


Sign in / Sign up

Export Citation Format

Share Document