A branch-and-bound algorithm for minimizing the total completion time in two-machine flowshop problem subject to release dates
Keyword(s):
Keyword(s):
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽
2004 ◽
Vol 159
(2)
◽
pp. 420-429
◽
Keyword(s):
2017 ◽
Vol 34
(03)
◽
pp. 1740014
◽
2016 ◽
Vol 33
(6)
◽
pp. 383-390
◽
2008 ◽
Vol 35
(4)
◽
pp. 1176-1190
◽
2002 ◽
Vol 139
(2)
◽
pp. 293-301
◽
Keyword(s):
2012 ◽
Vol 39
(5)
◽
pp. 939-951
◽
Keyword(s):