Construction cost management and control based on comprehensive unit price

Author(s):  
Ying Zhang ◽  
Mei Lu
2011 ◽  
Vol 368-373 ◽  
pp. 2369-2375
Author(s):  
Li Fang ◽  
Xin Ma

At present, the main methods of analyzing the reasons why construction cost always got out of control are qualitative analysis based on the practical construction experiences in the construction cost management. And these analyses were easily affected by subjective factors. By introducing a complete decomposition model, the influencing factors of the incontrollable construction cost in the construction stage can be decomposed to the effect of quantity changes and the effect of unit price changes of each kind of construction. A quantitative analysis will be carried on subsequently to analyzing these effects to find the main effects of the whole construction cost changes. This model made the analysis more objective and scientific, and can accumulate the data for new or planned similar constructions. To illustrate, the decomposition on construction cost changes of a small civil project is carried out.


2013 ◽  
Vol 357-360 ◽  
pp. 2621-2624
Author(s):  
Hua Zhi Zhang ◽  
Fang Pan ◽  
Zhen Hua Zhang ◽  
Cai Yun Cheng

A basic engineering cost management system is basis about the engineering cost management for national or regional. As the main basis of engineering cost is determined by two factors are engineering quantity and unit price, so the basic engineering cost management system should reflect the management and control model in the project of "quantity" and "price" of these two aspects in any country or region.


2021 ◽  
Vol 2 (5) ◽  
Author(s):  
Indra Almahdy ◽  
Muhammad Kholil ◽  
Jakfat Haekal ◽  
Tri Widodo

Pharmaceutical Companies is a place for people to get health services. One unit that has an important role is the Pharmacy division. Pharmacy services include patient care and are responsible for the provision of medicines and other medical devices. This study aimed to find the control of Medicine supplies in sufficient quantities, at the time needed and at the lowest cost. Management of Medicine supplies can be done using the Always, Better, and Control (ABC) method and the Vital, Essential, and Non-Essential (VEN) method to determine priorities in Medicine procurement so that funds are used efficiently. Furthermore, the EOQ (Economic Order Quantity) calculation is carried out to obtain optimal inventory.


Sign in / Sign up

Export Citation Format

Share Document