A New Interconnecting Method for Wind Turbine/Generators in a Wind Farm and Basic Performances of the Integrated System

2010 ◽  
Vol 57 (2) ◽  
pp. 468-475 ◽  
Author(s):  
S. Nishikata ◽  
F. Tatsuta
2013 ◽  
Vol 14 (3) ◽  
pp. 207-218 ◽  
Author(s):  
Kazuki Ogimi ◽  
Shota Kamiyama ◽  
Michael Palmer ◽  
Atsushi Yona ◽  
Tomonobu Senju ◽  
...  

Abstract In order to solve the problems of global warming and depletion of energy resource, renewable energy systems such as wind generation are getting attention. However, wind power fluctuates due to variation of wind speed, and it is difficult to perfectly forecast wind power. This paper describes a method to use power forecast data of wind turbine generators considering wind power forecast error for optimal operation. The purpose in this paper is to smooth the output power fluctuation of a wind farm and to obtain more beneficial electrical power for selling.


2007 ◽  
Vol 158 (4) ◽  
pp. 31-41 ◽  
Author(s):  
Tomonobu Senjyu ◽  
Ryosei Sakamoto ◽  
Naomitsu Urasaki ◽  
Toshihisa Funabashi ◽  
Hideki Fujita ◽  
...  

2021 ◽  
pp. 0309524X2110351
Author(s):  
Abeba Debru ◽  
Mulu Bayray ◽  
Marta Molinas

The objective of this paper was to assess the performance of the Adama-II Wind Farm in comparison to the feasibility study. Using 1-year mast data, the site potential was reassessed by WAsP software and the performance of wind turbine generators was assessed by 2 years of SCADA data. The obtained mean annual wind speed and power density were 7.75 m/s, and 462 W/m2 while in the feasibility study, 9.55 m/s, and 634.6 W/m2, which resulted in 18.8%, and 27.1% deviations respectively. The prevailing and secondary wind directions obtained were ENE and NE with 35.7% and 19.1% while, in the feasibility study, ENE with 36.5% and E with 17.3%. From the SCADA data, the Capacity factor, Annual Energy Production (AEP), and Availability of wind turbines were determined as 30.5%, 398 GWh, and 95.1%. The reasons for the deviation were difference in long-term correction data and weather conditions during study period.


2021 ◽  
Author(s):  
Miad Mohaghegh Montazeri

Using power electronic converters with reduced capacity in doubly-fed induction generator (DFIG) based wind turbines make them vulnerable to over-current during grid disturbances. This thesis aims to analyze the behaviour of doubly-fed induction generators based wind farm for various timing schemes of crowbar deactivation and resumption of rotor side converter (RSC) in the case of grid fault. Also, usage of a static synchronous compensator (STATCOM) for the purpose of stabilizing the grid voltage after a three-phase fault is studied in this these. Moreover, finding minimum capacity of STATCOM which ensures low-voltage ride through (LVRT) of wind farm is studied. Finally, coordination of reactive power from wind turbine generators and STATCOM in steady-state condition is performed. All the results in this thesis show that STATCOM improves low voltage ride through (LVRT) capability of wind farm and assists for an uninterrupted operation of wind turbine generators during grid faults.


Sign in / Sign up

Export Citation Format

Share Document