Geomagnetically Induced Current Calculation of High Voltage Power System with Long Transmission Lines using Kriging Method

Author(s):  
Yuhao Chen ◽  
Yanzhao Xie ◽  
Minzhou Liu ◽  
Zong-yang Wang ◽  
Qing Liu ◽  
...  
IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 200237-200258
Author(s):  
Zmnako Mohammed Khurshid Abda ◽  
Nur Fadilah Ab Aziz ◽  
Mohd Zainal Abidin Ab Kadir ◽  
Zeti Akma Rhazali

Author(s):  
Lars Abrahamsson ◽  
Daniel Serrano Jimenez ◽  
John Laury ◽  
Math Bollen

In present-day railway power supply systems using an AC frequency lower than the one in the public power system of 50/60 Hz, high voltage overhead transmission lines are used as one measure of strengthening the railway power supply system grids. This option may be economically beneficial, compared to strengthening the grid purely by increasing the density of converter stations or increasing the cross section areas of the overhead catenary wires. High voltage AC transmission lines in the railway power supply system allow larger distances between converter stations than would otherwise be possible for a given amount of train traffic. Moreover, the introduction of AC transmission lines implies reduced line losses and reduced voltage level fluctuations at the catenary for a given amount of train traffic. However, due to the increased public and government resistance for additional overhead high voltage AC transmission lines in general, different alternatives will be needed for the future improvements and strengthening of railway power systems. For a more sustainable transport sector, the share and amount of railway traffic needs to increase, in which case such a strengthening becomes inevitable. Earlier, usage of VSC-HVDC transmission cables has been proposed as one alternative to overhead AC transmission lines. One of the main benefits with VSC-HVDC transmission is that control of power flows in the railway power systems is easier and that less converter capacity may be needed. Technically, VSC-HVDC transmission for railway power systems is a competitive solution as it offers a large variety of control options. However, there might be other more economical alternatives reducing the overall impedance in the railway power system. In public power systems with the frequency of 50/60 Hz, an excess of reactive power production in lowly utilized cables imposes an obstacle in replacing overhead transmission lines with cables. In low frequency AC railway power system, the capacitive properties are less significant allowing longer cables compared to 50/60 Hz power systems. Moreover, in converter-fed railways, some kind of reactive compensation will automatically be applied during low-load. At each converter station, voltage control is already present following the railway operation tradition. Therefore, in this paper, we propose AC cables as a measure of strengthening low-frequency AC railway power systems. The paper compares the electrical performances of two alternative reinforcement cable solutions with the base case of no reinforcement. The options of disconnecting or toggling the cables at low load as well as the automatic reactive compensation by converter voltage control are considered. Losses and voltage levels are compared for the different solutions. Investment costs and other relevant issues are discussed.


2021 ◽  
Vol 1768 (1) ◽  
pp. 012007
Author(s):  
Z M Khurshid ◽  
N F Ab Aziz ◽  
M Z A Ab Kadir ◽  
Z A Rhazali

Sign in / Sign up

Export Citation Format

Share Document