Study on the temperature effect of concrete continuous beam bridge

Author(s):  
Gongtao Wang ◽  
Lei Wang
2014 ◽  
Vol 915-916 ◽  
pp. 133-136
Author(s):  
Xiang Hong Zhu ◽  
Zeng Bin Jiang

Construction of Fozhao intercity bridge in Guangzhou was a three-span prestressed concrete continuous beam bridge. The bridge adopted triangle hanging basket cantilever pouring construction method. The bridge mixed cable-stayed spans, H form tower and typical highway bridge elements. It spaned across the exiting transport hubs center, with modern and ethereal shape, and became a new landmark of the city.


Sign in / Sign up

Export Citation Format

Share Document