scholarly journals Artificial bee colony algorithm applied to optimal power flow solution incorporating stochastic wind power

Author(s):  
Vian H. Ahgajan ◽  
Yasir G. Rashid ◽  
Firas Mohammed Tuaimah

<span lang="EN-US">This paper focuses on the artificial bee colony (ABC) algorithm, which is a nonlinear optimization problem. is proposed to find the optimal power flow (OPF). To solve this problem, we will apply the ABC algorithm to a power system incorporating wind power. The proposed approach is applied on a standard IEEE-30 system with wind farms located on different buses and with different penetration levels to show the impact of wind farms on the system in order to obtain the optimal settings of control variables of the OPF problem. Based on technical results obtained, the ABC algorithm is shown to achieve a lower cost and losses than the other methods applied, while incorporating wind power into the system, high performance would be gained.</span>

2013 ◽  
Vol 2013 ◽  
pp. 1-9 ◽  
Author(s):  
Luong Le Dinh ◽  
Dieu Vo Ngoc ◽  
Pandian Vasant

This paper proposes an artificial bee colony (ABC) algorithm for solving optimal power flow (OPF) problem. The objective of the OPF problem is to minimize total cost of thermal units while satisfying the unit and system constraints such as generator capacity limits, power balance, line flow limits, bus voltages limits, and transformer tap settings limits. The ABC algorithm is an optimization method inspired from the foraging behavior of honey bees. The proposed algorithm has been tested on the IEEE 30-bus, 57-bus, and 118-bus systems. The numerical results have indicated that the proposed algorithm can find high quality solution for the problem in a fast manner via the result comparisons with other methods in the literature. Therefore, the proposed ABC algorithm can be a favorable method for solving the OPF problem.


2018 ◽  
Vol 7 (4) ◽  
pp. 2766 ◽  
Author(s):  
S. Surender Reddy

This paper solves a multi-objective optimal power flow (MO-OPF) problem in a wind-thermal power system. Here, the power output from the wind energy generator (WEG) is considered as the schedulable, therefore the wind power penetration limits can be determined by the system operator. The stochastic behavior of wind power and wind speed is modeled using the Weibull probability density function. In this paper, three objective functions i.e., total generation cost, transmission losses and voltage stability enhancement index are selected. The total generation cost minimization function includes the cost of power produced by the thermal and WEGs, costs due to over-estimation and the under-estimation of available wind power. Here, the MO-OPF problems are solved using the multi-objective glowworm swarm optimiza-tion (MO-GSO) algorithm. The proposed optimization problem is solved on a modified IEEE 30 bus system with two wind farms located at two different buses in the system.  