Synthetic Storm Damage (Fraud) to Roof Surfaces

2021 ◽  
pp. 149-170
Author(s):  
Stephen E. Petty
Keyword(s):  
Author(s):  
S. Caleb Douglas ◽  
Tyrel G. Wilson

Union Pacific Railroad’s Moffat Tunnel Subdivision, west of Denver, Colorado, was significantly impacted by an approximately 500 to 1,000 year storm event that occurred between September 9, 2013 and September 13, 2013. As a result of this historic event, washouts, earth slides, and debris flows severely impacted track infrastructure by eroding track embankments, destabilizing surrounding native slopes, and overwhelming stormwater infrastructure. Emergency response activities performed to restore track operations at Milepost (MP) 25.65 and MP 22.86 required the integration of civil, hydraulic, environmental and geotechnical engineering disciplines into emergency response and construction management efforts. Additionally, support from UPRR’s Real Estate Division was required when addressing private ownership and site access issues. The following text summarizes how coordinated efforts between various groups worked together in a pressure setting to restore rail service. The most significant damage occurred at MP 25.65 in a mountainous slot canyon between two tunnels accessible only by rail and consisted of a washout, approximately 200 feet (61 m) in length with a depth of 100 feet (30 m). MP 22.86 experienced slides on both sides of the track resulting in an unstable and near vertical track embankment which required significant fill and rock armoring. In addition to the embankment failures at MP 22.86, flood flows scoured around the underlying creek culvert, further threatening the geotechnical stability of the track embankment. The storm event highlighted the vulnerability of fill sections, where original construction used trestles. The repair plan engineered for MP 25.65 was developed to restore the lost embankment fill to near pre-flood conditions while limiting environmental impacts in order to minimize regulatory permitting requirements. Fill replacement performed during the initial emergency response was completed within 22 days, notwithstanding site remoteness and difficult access. Repair of the embankment required the placement of approximately 90,000 cubic yards (68,800 cubic meters) of fill and installation of four 48-inch (122-cm) culverts. Repair of embankment sloughing and scour damage at MP 22.86 was accomplished without the need for environmental permits by working from above the ordinary high water mark, using a “one track in – one track out” approach while restoring infrastructure to pre-flood conditions. A new headwall to address flow around the culvert inlet received expedited permit authorization from the U.S. Army Corps of Engineers by limiting the construction footprint through implementation of best management practices and minimizing placement of fill below the ordinary high water mark. Service interruptions, such as those at MP 22.86 and MP 25.65, require sound engineering practices that can be quickly and efficiently implemented during emergency response situations that often occur in less than ideal working environments. Track outages not only impact the efficiency of a railroad’s operating network, but also impact interstate and global commerce as transportation of goods are hindered. The need to have a team of experienced engineering and construction professionals responding to natural disasters was demonstrated by this storm event.


2004 ◽  
Vol 188 (1-3) ◽  
pp. 197-210 ◽  
Author(s):  
Annett Wolf ◽  
Peter Friis Møller ◽  
Richard H.W. Bradshaw ◽  
Jaris Bigler

2013 ◽  
Vol 5 (3) ◽  
pp. 1405-1424 ◽  
Author(s):  
Eija Honkavaara ◽  
Paula Litkey ◽  
Kimmo Nurminen

One Ecosystem ◽  
2021 ◽  
Vol 6 ◽  
Author(s):  
Daniel Bayley ◽  
Paul Brickle ◽  
Paul Brewin ◽  
Neil Golding ◽  
Tara Pelembe

Kelp forests provide many important ecosystem services to people, including mitigating storm damage, cycling nutrients, and providing commercially-harvestable resources. However, kelp forests’ ability to sequester carbon dioxide, and therefore help regulate the climate, has until recently, been overlooked in assessments of the beneficial services they provide. In this study we incorporate updated knowledge on the potential of kelp to sequester ‘blue carbon’, and use the extensive kelp forests of the Falkland Islands as a case study to assess the value of kelp forest to society through multiple associated ecosystem services. Our analysis shows kelp forests provide a highly valuable range of direct and indirect services, which if managed correctly, will continue to benefit people, both now and in the future. The total estimated value of the Falkland Islands’ kelp system is currently equivalent to ~ £2.69 billion per year (or £3.24 million km-2 year-1). However, the true value of the kelp forest surrounding the Falkland Islands is likely to be higher still, given that our estimate does not account for elements such as associated scientific research, tourism, and cultural services, due to the necessary data currently being unavailable. Similarly, the full value of these highly biodiverse ecosystems in supplying habitat and food to a large range of associated species is crucial, yet extremely difficult to fully quantify. This study illustrates the importance of maintaining kelp ecosystems in a healthy state to ensure they continue to supply valuable ecological processes, functional roles, and ecosystem services, including their overlooked role as significant long-term carbon sinks.


Weather ◽  
1957 ◽  
Vol 12 (12) ◽  
pp. 385-386
Author(s):  
D. G. Armour
Keyword(s):  

1997 ◽  
Vol 11 (4) ◽  
pp. 168-177 ◽  
Author(s):  
Ben L. Sill ◽  
Ronald T. Kozlowski
Keyword(s):  

2018 ◽  
Vol 12 (5) ◽  
pp. 635-643 ◽  
Author(s):  
Joie D. Acosta ◽  
Lane Burgette ◽  
Anita Chandra ◽  
David P. Eisenman ◽  
Ingrid Gonzalez ◽  
...  

AbstractObjectiveTo summarize ways that networks of community-based organizations (CBO), in partnership with public health departments, contribute to community recovery from disaster.MethodsThe study was conducted using an online survey administered one and 2 years after Hurricane Sandy to the partnership networks of 369 CBO and the New York Department of Health and Mental Hygiene. The survey assessed the structure and durability of networks, how they were influenced by storm damage, and whether more connected networks were associated with better recovery outcomes.ResultsDuring response and recovery, CBOs provide an array of critical public health services often outside their usual scope. New CBO partnerships were formed to support recovery, particularly in severely impacted areas. CBOs that were more connected to other CBOs and were part of a long-term recovery committee reported greater impacts on the community; however, a partnership with the local health department was not associated with recovery impacts.ConclusionCBO partners are flexible in their scope of services, and CBO partnerships often emerge in areas with the greatest storm damage, and subsequently the greatest community needs. National policies will advance if they account for the dynamic and emergent nature of these partnerships and their contributions, and clarify the role of government partners. (Disaster Med Public Health Preparedness. 2018;12:635–643)


2019 ◽  
Vol 31 (3) ◽  
pp. 729-742
Author(s):  
Abdullah E. Akay ◽  
İnanç Taş

Sign in / Sign up

Export Citation Format

Share Document