Lean Quality in Construction Project Delivery—A New Model and Principles

Author(s):  
John Oakland ◽  
Marton Marosszeky
Author(s):  
Clinton Aigbavboa ◽  
Neo Malose Masemeni ◽  
Wellington Thwala

This chapter report on some of the challenges faced and successes achieved during the construction of the recently completed Department of Environmental Affairs (DEA) headquarters in South Africa. Qualitative interviews where conducts with five (5) professionals which were part of the construction supply chain team that completed the DEA project in South Africa. Findings summary were that the South African construction industry exists in a very dynamic and volatile environment with common challenges as evident in other countries. This challenge, necessitates the use of collaborative means of managing the various phases of the supply chain. It was also found that the use of collaborative models such as Public Private Partnership (PPP) can prove rewarding when stakeholders involved in a project have an understanding of the model and its dynamics. This chapter contributes to the use of PPP collaborative models in construction project delivery in South Africa.


Author(s):  
Clinton Aigbavboa ◽  
Neo Malose Masemeni ◽  
Wellington Thwala

This chapter report on some of the challenges faced and successes achieved during the construction of the recently completed Department of Environmental Affairs (DEA) headquarters in South Africa. Qualitative interviews where conducts with five (5) professionals which were part of the construction supply chain team that completed the DEA project in South Africa. Findings summary were that the South African construction industry exists in a very dynamic and volatile environment with common challenges as evident in other countries. This challenge, necessitates the use of collaborative means of managing the various phases of the supply chain. It was also found that the use of collaborative models such as Public Private Partnership (PPP) can prove rewarding when stakeholders involved in a project have an understanding of the model and its dynamics. This chapter contributes to the use of PPP collaborative models in construction project delivery in South Africa.


2016 ◽  
Vol 2016 ◽  
pp. 1-7 ◽  
Author(s):  
William Paolillo ◽  
Branka V. Olson ◽  
Edward Straub

People-centered innovation is a paradigm shift in the construction industry. It is derived from the supposition that people not methods, schedules, or budgets deliver projects. Our data suggest that a multilevel, multidisciplinary project team through shared vision, values, and a common vernacular defines, designs, and delivers more successful projects than traditional methods. These projects meet the needs of shareholders, the community, stakeholders, and the planet. We employ the concepts of emotional intelligence and agency theory to explain an integrated project delivery (IPD) construction project using lean tactics that not only delivered, but also exceeded expectations resulting in a six-month schedule acceleration and $60M savings over the original estimated cost of the project calculated assuming traditional project delivery methods. The safety rating for this project was 50% better than the national average and the expected improvement in operating margin for the new building is 33% greater. This paper introduces the notion of people-centered innovation to an industry that has struggled to adapt and show positive results over recent decades. Our case study describes the significance of people-centered innovation in construction project delivery. We discuss the implications for the construction industry going forward.