Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem
Keyword(s):
2010 ◽
Vol 34
(11)
◽
pp. 3642-3647
◽
Keyword(s):
Keyword(s):
2008 ◽
Vol 43
(7-8)
◽
pp. 810-821
◽
2011 ◽
Vol 10
◽
pp. 374-378
◽
1995 ◽
Vol 87
(2)
◽
pp. 284-288
◽
Keyword(s):
1996 ◽
Vol 47
(1)
◽
pp. 175
◽
Keyword(s):
2002 ◽
Vol 19
(5)
◽
pp. 59-67
◽