Die wirtschaftliche Bedeutung der Qualitätskontrolle / The economic importance of quality control / L’importance économique du contrôle de qualité

1968 ◽  
Vol 10 (1) ◽  
pp. 5-7
Author(s):  
Günther Pistorius
Author(s):  
Francisco V. Cipolla-Ficarra

We present the main aspects of the importance of carrying out quality measurements in multimedia/interactive systems in the current era of expansion of communicability. Besides we disclose the first key elements to carry out techniques and/or methodologies to discover the quality attributes of an interactive system, such as the realization of quality metrics and the process of a heuristic evaluation. A set of examples online and off-line complete the current research work. In this set is stressed the economic importance of the process of evaluation in services and products related to the software, as well as some of the human factors to gain the hegemony of quality control.


1988 ◽  

Cette étude a pour objet de déterminer comment se pratique le contrôle de qualité, de la part des Etats, des produits et des services touristiques offerts par les différentes entreprises et organisations de tourisme de par le monde. 11 s'agit d'une présentation et d'une évaluation des différentes méthodes qui peuvent être utilisées pour permettre d'améliorer le niveau des services et des produits touristiques. Cette étude doit en outre déterminer comment mettre en oeuvre les mesures réglementaires et administratives existantes ou bien 2 créer 2 la disposition des administrations chargées du tourisme pour contrôler la qualité des produits et des services touristiques.


Author(s):  
J. A. Van Meulen

AbstractIn August 1993 Baggermaatschappij Boshalis was awarded a contract for the construction of a breakwater (1400 m parallel to the coast) and four rock groynes (180 m each) in Malaysia. The award was based on the company's alternative design, which was to use 11 and 20 t concrete armour units (tetrapods) totaling 115 000 m3 of concrete and 2.1 x 106 t of rock with sizes from 50 mm to 9.0 t. The quantities of the various rock grades chosen in the alternative design were optimized to suit the assumed production possibilities of rock block sizes from sources in the area. After award of the contract, a new quarry only 8.0 km from the construction site was opened, the nearest existing quarry being 38 km away. The new quarry started deliveries on 1 April 1994 and completed them on 17 April 1995.A case history of the quarry is presented, emphasizing the economic importance of the rock fragmentation and the logistics common to most dedicated armourstone quarry operations. It describes the tender stage, the choice of quarry location and the choice of the various specified rock gradings made during the breakwater design process. The blasting procedures used to obtain the required gradings and quantities are discussed. The particular features and problems associated with opening and operating a dedicated armourstone quarry — for example, the selection plant, the stockpiling procedures, shipping and materials quality control procedures — are amplified upon.


1988 ◽  

Cette étude a pour objet de déterminer comment se pratique le contrôle de qualité, de la part des Etats, de produits et des services touristiques offerts par les différentes entreprises et organisations de tourisme de par le monde. Il s’agit d’une présentation et d’une évaluation des différentes méthodes qui peuvent être utilisées pour permettre d’améliorer le niveau des services et des produits touristiques.


Sign in / Sign up

Export Citation Format

Share Document