An Improved Identification Method of Magnetizing Inrush Current Phenomena in Distribution System

2012 ◽  
Vol 132 (3) ◽  
pp. 260-267 ◽  
Author(s):  
Tatsuhiko Maeda ◽  
Tadashi Naitoh ◽  
Atsushi Toyama ◽  
Keiki Takeda
2010 ◽  
Vol 130 (4) ◽  
pp. 430-436 ◽  
Author(s):  
Naoki Dou ◽  
Atushi Toyama ◽  
Kohki Satoh ◽  
Tadashi Naitoh ◽  
Kazuyuki Masaki

2011 ◽  
Vol 131 (3) ◽  
pp. 263-270 ◽  
Author(s):  
Takayuki Ozeki ◽  
Tadashi Naitoh ◽  
Atsushi Toyama ◽  
Kohki Satoh ◽  
Keiki Takeda ◽  
...  

2012 ◽  
Vol 132 (6) ◽  
pp. 588-596
Author(s):  
Tadashi Naitoh ◽  
Keiki Takeda ◽  
Atsushi Toyama ◽  
Tatsuhiko Maeda

2013 ◽  
Vol 185 (3) ◽  
pp. 21-32
Author(s):  
Tadashi Naitoh ◽  
Keiki Takeda ◽  
Atsushi Toyama ◽  
Tatsuhiko Maeda

2012 ◽  
Vol 181 (1) ◽  
pp. 1-10 ◽  
Author(s):  
Naoki Dou ◽  
Atushi Toyama ◽  
Kohki Satoh ◽  
Tadashi Naitoh ◽  
Kazuyuki Masaki

2020 ◽  
Vol 10 (10) ◽  
pp. 20-32
Author(s):  
Aleksey A. KUVSHINOV ◽  
◽  
Vera V. VAKHNINA ◽  
Aleksey N. CHERNENKO ◽  
◽  
...  

The mathematical model of a shell-core power transformer’s magnetization branch is substantiated. By using the model, analytical expressions for the magnetizing current instantaneous values under the conditions of geomagnetic disturbances can be obtained. Quantitative assessments of the magnetizing inrush current amplitudes and durations versus the geomagnetic disturbance intensity are obtained. The dynamics of the power transformer magnetic system saturation transient and changes in the magnetization inrush current amplitudes and durations after a sudden occurrence of geomagnetic disturbances are shown. The error of estimating the magnetizing inrush current amplitudes under geomagnetic disturbances is determined based on comparison with experimental data.


2013 ◽  
Vol 732-733 ◽  
pp. 958-964
Author(s):  
Yao Zhao ◽  
Yu De Yang ◽  
Yan Hong Pan ◽  
Le Qi

The feasibility of transformer fast reenergizing with neutral point ungrounded after the external fault being removed is analyzed in this paper. By calculating overvoltage and discriminating magnetizing inrush current, it analyzes four ways to restore power of transformer and chooses the optimal strategy which is safe and time-saving. The result shows that in the case of transformer neutral point ungrounded, closing the low-voltage circuit side breaker before the high-voltage, which can effectively limit over-voltage in a safe range. The second harmonic characteristic of magnetizing waveform may disappear, while the intermittent angle characteristics are still significant. With the help of the intermittent angle principle, transformer differential protection may not misuse. The average time for each customer interruption is reduced from 40 minutes to 10 minutes and saves an hour for engineer on the way back and forth. It will greatly improve power supply reliability.


Author(s):  
Kanjun Zhang Kanjun Zhang ◽  
Xuanwei Qi Xuanwei Qi ◽  
Shiyun Zhang Shiyun Zhang ◽  
Wenbin Cao Wenbin Cao ◽  
Fan Yang Fan Yang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document