Innovative CT Abrasive Hydrajetting Perforating Approach in A Complex Saudi Arabian Gas Well Overcomes Initial Inability to Perform A Proppant Fracturing Treatment and Achieves Better Than Expected Results: A Case History

Author(s):  
Walter Nunez Garcia ◽  
Jose Ricardo Solares ◽  
Ataur Ripon Malik ◽  
Jose R. Vielma ◽  
Alejandro Chacon ◽  
...  
2011 ◽  
Author(s):  
Mohammed Jasem Al-Saeedi ◽  
Fayez Abdulrahman Al Fayez ◽  
Dakhil Rasheed Al Enezi ◽  
mahesh sounderrajan ◽  
Mishary Najeeb Al-Mudhaf ◽  
...  
Keyword(s):  
Gas Well ◽  

2013 ◽  
Vol 423-426 ◽  
pp. 2035-2039
Author(s):  
Long Cang Huang ◽  
Yin Ping Cao ◽  
Yang Yu ◽  
Yi Hua Dou

In the process of oil and gas well production, tubing connection stand the axial alternating load during open well, shut well and fluid flow. In order to know premium connection seal ability under the loading, two types of P110 88.9mmx6.45mm premium tubing connections which called A connection and B connection are performed with finite element analysis, in which contact pressures and their the regularities distribution on sealing surface are analyzed. The results show that with the increasing of cycle number, the maximum contact pressures on sealing surface of both A connection and B connection are decreased. The decreasing of the maximum contact pressures on B connection is greater than those on A connection. With the increasing of cycle number of axial alternating compression load, the maximum contact pressure on sealing surface of A connection is decreased, and the maximum contact pressure on sealing surface of B connection remains constant. Compared the result, it shows that the seal ability of A connection is better than B connection under axial alternating tension load, while the seal ability of B connection is better than type A connection under axial alternating compression load.


2011 ◽  
Author(s):  
Victor Gerardo Vallejo ◽  
Aciel Olivares ◽  
Pablo Crespo Hdez ◽  
Eduardo R. Roman ◽  
Claudio Rogerio Tigre Maia ◽  
...  

2016 ◽  
Author(s):  
Minh Vo ◽  
Kevin Scott ◽  
Chaohong Xiao ◽  
Qiang Wang ◽  
Zhengxing Dai ◽  
...  

2013 ◽  
Author(s):  
Zillur Rahim ◽  
Hamoud Al-Anazi ◽  
Dwi Waspada ◽  
Adnan Al-Kanaan

2010 ◽  
Author(s):  
Jim McBee ◽  
Amit Kumar Singh ◽  
Chris Arceneaux ◽  
Sandra Lee Berry
Keyword(s):  
Gas Well ◽  

2011 ◽  
Vol 284-286 ◽  
pp. 1049-1052 ◽  
Author(s):  
Zheng Fan ◽  
Wen Hong Li ◽  
Dong Li ◽  
Cun Ju Liu ◽  
Yu Luo ◽  
...  

The ability of IMC-80BH corrosion inhibitor is proven to be excellent in earlier indoor static and flowing evaluation and it is worthwhile to determine the inhibitor concentration to maintain the optimum concentration for the sake of effective gas well protection. A improved concentration determination method is aboratively investigated. The maximum absorption wavelengths, buffer solution, reaction time and additive dosage of chromogenic reagent XD are detected successively and the standard curve of liquid phase behaves better than oil gas. The sample verification demonstrates that such determination measurement is reliable and precise. The four representative gas wells including G8-7, S59, W26-5 and G49-6 in service are also determined. The determination result offered substantial basis to analyze and select appropriate inhibitor injection program and dosage.


Sign in / Sign up

Export Citation Format

Share Document