Non-operating Urban Infrastructure Project Management Maturity Model
on Agent Construction Based on the Evolutionary Algorithm
2015 ◽
Vol 9
(1)
◽
pp. 112-116
Keyword(s):
On the basis of comparing domestic and abroad project management maturity model and issuing questionnaires to collect the views of museum project management staff, we construct a project management maturity model based on agent-construction system by non-operating urban infrastructure projects. The results show that application of agentconstruction system in non-operating urban infrastructure projects is feasible.
2015 ◽
Vol 9
(1)
◽
pp. 323-323
2013 ◽
Vol 5
(2)
◽
pp. 693-701
◽
Keyword(s):
Keyword(s):