scholarly journals Production System Analysis of Brem Processing Unit (Case Study: The Industrial Centers of Brem in Kaliabu and Bancong Village, Madiun District)

2014 ◽  
Vol 17 (3) ◽  
pp. 159-170 ◽  
Author(s):  
Ardaneswari Citraresmi ◽  
Sri Kumalaningsih ◽  
Imam Santoso
2005 ◽  
Vol 27 (2) ◽  
pp. 69-104 ◽  
Author(s):  
R. K. Avasthe ◽  
Tshering T. Bhutia ◽  
Yashoda Pradhan ◽  
K. Das

2012 ◽  
Vol 542-543 ◽  
pp. 320-323 ◽  
Author(s):  
Ling Zhao

The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.


2013 ◽  
Author(s):  
Sanjay K. Singh ◽  
James W. Hall ◽  
Eraky Khalil ◽  
Balsam Al-Marri ◽  
Reem Al-Abdulla

Sign in / Sign up

Export Citation Format

Share Document