Self Scheduling of a Virtual Power Plant in Energy and Reserve Electricity Markets: A Stochastic Adaptive Robust Optimization Approach

Author(s):  
Ana Baringo ◽  
Luis Baringo ◽  
Jose M. Arroyo
2017 ◽  
Vol 95 ◽  
pp. 15001
Author(s):  
Tianxiang Geng ◽  
Li Xiang ◽  
Maosheng Ding ◽  
Feng Li

2020 ◽  
Author(s):  
Simon Camal ◽  
Andrea Michiorri ◽  
Georges Kariniotakis

<p>The aggregation of multiple renewable plants located in distinct climate zones, using different energy sources, enables to reduce the production uncertainty when compared to the production of a single plant. Such aggregations, controlled by a Virtual Power Plant (VPP) system, are good candidates for the provision of ancillary services. Stochastic optimization models are available to optimize biddings on ancillary services and energy markets (see for instance [1]). These models require trajectories of the renewable VPP production that anticipate production uncertainty and reproduce correctly the temporal correlations observed in the production signal. This is particularly important in ancillary services markets, where a reserve bid must be guaranteed over a production duration or validity period during which power fluctuations are significant (e.g. lasting currently 24 hours on the European common market for Frequency Containment Reserve, with a foreseen evolution to 4 hours by July 2020 [2]). <br>Production trajectories may be obtained by coupling probabilistic forecasts and a model of temporal dependencies between forecast horizons [3] and possibly spatial dependencies in the case of a multivariate forecast at the scale of a region or a portfolio [4]. In the case of a renewable VPP, the aggregated production is primarily of interest. In this work, we propose a methodology to generate trajectories of aggregated production from probabilistic forecasts obtained with decision-tree based models or neural networks. A copula models the dependency between forecast horizons and the space defined by the plants contained in the aggregation. The model is tested in a day-ahead forecasting configuration on a 54 MW VPP comprising 15 plants with 3 different energy sources (Photovoltaics, Wind, Hydro). The comparison of trajectories generated from a direct forecast of the aggregated production and from forecasts at lower levels of the aggregation shows that the latter solution reproduces with more accuracy the temporal variability of the aggregated production over the whole horizon range, especially when Photovoltaics dominates the production capacities in the aggregation (15 % improvement of the Variogram Score).<br> [1]: Soares, T., & Pinson, P. (2017). Renewable energy sources offering flexibility through electricity markets. Technical University of Denmark.<br>[2]: ENTSO-E. (2018). TSO’s proposal for the establishment of common and harmonised rules and processes for the exchange and procurement of Balancing Capacity for Frequency Containment Reserves (FCR) TSOs’ proposal for the establishment of common and harmonised rules and pro-c, (October), 1–9.<br>[3]: Pinson, P., Madsen, H., Nielsen, H. A., Papaefthymiou, G., & Klöckl, B. (2009). From probabilistic forecasts to statistical scenarios of short-term wind power production. Wind Energy, 12(1), 51–62. <br>[4]: Golestaneh, F., Gooi, H. B., & Pinson, P. (2016). Generation and evaluation of space–time trajectories of photovoltaic power. Applied Energy, 176, 80–91. </p>


2014 ◽  
Vol 590 ◽  
pp. 511-515
Author(s):  
Ya Chin Chang ◽  
Sung Ling Chen ◽  
Rung Fang Chang ◽  
Chan Nan Lu

As the integrator of energy resources (DERs), a virtual power plant (VPP) would be able to control the amount of the power access to the distribution transformers such that energy efficiency can be improved. Battery energy storage system (BESS) and demand response (DR) as DERs can entrust the VPP with certain controllability to regulate the power supply of the distribution system. This paper aims to maximize the benefit of the supplied powers over the 24 hours under VPP operation. Combining an iterative dynamic programming optimal BESS schedule approach and a PSO-based DR scheme optimization approach, an optimal VPP operational method is proposed to minimize the total electricity cost with respect to the power supply limit of the distribution transformers and the system security constraints, especially, within the peak load hours. With the TOU rate given each hour, test results had confirmed the validity of the proposed method with the obviously decreased power supply in each peak-load hours and the largely reduced electricity cost accordingly.


Sign in / Sign up

Export Citation Format

Share Document