Research of burst hazard of rocks on Rasyumchorrsk mineral deposit by application of special technical means

2019 ◽  
Vol 8 (30) ◽  
pp. 98-105
Author(s):  
M.I. Rasskazov ◽  
◽  
A.V. Gladyr ◽  
A.V. Tereshkin ◽  
D.I. Thoi ◽  
...  
Keyword(s):  
2019 ◽  
Vol 129 ◽  
pp. 01022 ◽  
Author(s):  
Maksim Rasskazov ◽  
Andrei Gladyr ◽  
Andrei Tereshkin ◽  
Anna Rasskazova ◽  
Denis Tsoy ◽  
...  

Results of geomechanical research of burst hazard of the rock mass of Rasvumchorr mineral deposit with application of measuring complex are presented in the paper. Measuring complex includes the automated seismoacoustic system of rock pressure control "Prognoz-ADS" and the local geoacoustic device "Prognoz L". The measuring complex was developed in Mining Institute of the Far Eastern branch of Russian Academy of Sciences. Measurements and the analysis of parameters of the seismoacoustic events reflecting geomechanical processes in the developed massif is the basis for estimation of rock massif burst hazard.


1998 ◽  
Author(s):  
Warren J. Nokleberg ◽  
Timothy D. West ◽  
Kenneth M. Dawson ◽  
Vladimir I. Shpikerman ◽  
Thomas K. Bundtzen ◽  
...  

1997 ◽  
Author(s):  
Warren J. Nokleberg ◽  
Timothy D. West ◽  
Kenneth M. Dawson ◽  
Vladimir I. Shpikerman ◽  
Thomas K. Bundtzen ◽  
...  

1977 ◽  
Vol 13 (1) ◽  
pp. 80-82
Author(s):  
I. V. Nedashkovskii ◽  
A. I. Panteleev ◽  
N. I. Voronkov

2017 ◽  
Vol 91 ◽  
pp. 133-152 ◽  
Author(s):  
Gilles Levresse ◽  
Janet Villarreal-Fuentes ◽  
Angel F. Nieto-Samaniego ◽  
Paul Alexandre ◽  
Rodolfo Corona-Esquivel ◽  
...  

2019 ◽  
Vol 219 (3) ◽  
pp. 1698-1716 ◽  
Author(s):  
M Malovichko ◽  
A V Tarasov ◽  
N Yavich ◽  
M S Zhdanov

SUMMARY This paper presents a feasibility study of using the controlled-source frequency-domain electromagnetic (CSEM) method in mineral exploration. The method has been widely applied for offshore hydrocarbon exploration; however, nowadays this method is rarely used on land. In order to conduct this study, we have developed a fully parallelized forward modelling finite-difference (FD) code based on the iterative solver with contraction-operator preconditioner. The regularized inversion algorithm uses the Gauss–Newton method to minimize the Tikhonov parametric functional with the Laplacian-type stabilizer. A 3-D parallel inversion code, based on the iterative finite-difference solver with the contraction-operator preconditioner, has been evaluated for the solution of the large-scale inverse problems. Using the computer simulation for a synthetic model of Sukhoi Log gold deposit, we have compared the CSEM method with the conventional direct current sounding and the CSEM survey with a single remote transmitter. Our results suggest that, a properly designed electromagnetic survey together with modern 3-D inversion could provide detailed information about the geoelectrical structure of the mineral deposit.


1970 ◽  
Vol 6 (6) ◽  
pp. 660-667
Author(s):  
A. E. Ol'khovichenko ◽  
V. P. Chuberkis
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document