scholarly journals PENGARUH VARIASI JUMLAH SUDU PADA SISTEM PEMBANGKIT LISTRIK TENAGA AIR TERHADAP DAYA YANG DIHASILKAN

2018 ◽  
Vol 2 (2) ◽  
Author(s):  
Sri Widodo ◽  
Kun Suharno ◽  
Sigit Mujiarto ◽  
Nazarudin Rif'at Rasyidi

Indonesia has the potential of water that can become electricity with a hydroelectric power plant. In addition, the distribution of the PLN network has not reached all regions of Indonesia. From these problems the author made a hydropower generator by comparing the number of blades used with a number of 8, 10, and 12 pieces. This study aims to determine the power that will be generated from the number of blades. Data retrieval is done by calculating the power produced by the turbine with a variation of the test time of 20 minutes by 5x. The working principle of this tool is that the water will rotate the wheel connected to the generator with the help of shafts, bearings, pulleys, and V-belts that produce electrical power in the battery so that the electricity can be directly used. The results obtained that the output power is the largest in the use of a number of 12 pieces of blades namely 0.0687 HP, while the number of blades 8 and 10 pieces produces the amount of output power of 0.0627 HP and 0.0652 HP.

2021 ◽  
Vol 21 (01) ◽  
pp. 31-44
Author(s):  
Diana Hanafi ◽  
Harmiyati

[ID] Pada musim kemarau PLTA Koto Panjang pernah mengoperasikan satu unit turbin dan generator sehingga daya yang dihasilkan tidak maksimal. Pada musim yang sama PLTA ini juga pernah mengoperasikan tiga unit turbin dan generator namun hanya menghasilkan daya listrik  35 MW dengan prosentase  50 % yaitu  30,702 % dari daya maksimal pengoperasian tiga unit turbin dan generator. Tujuan dari penelitian ini adalah untuk mengetahui debit andalan PLTA Koto Panjang, optimalisasi yang dilakukan dalam mengoptimasi PLTA Koto Panjang, daya listrik yang dihasilkan dari hasil optimalisasi tersebut dan perbandingannya. Metode empiris Penman digunakan untuk menghitung nilai evaporasi. Debit andalan untuk debit outflow PLTA saat ini dan setelah dioptimalisasi dihitung menggunakan rumus daya listrik dan metode mass curve. Selanjutnya debit outflow PLTA yang telah didapatkan dianalisis di dalam tabel water balance menggunakan metode sequent peak analysis. Hasil yang didapatkan adalah debit andalan PLTA saat ini dan setelah dioptimalisasi yaitu 305,319 m3/det dan 384,465 m3/det dengan prosentase 51,995 % dan 39,235 %. Optimalisasi dilakukan dengan menyesuaikan debit outflow dengan volume air yang ada pada storage saat itu. Daya listrik setelah dioptimalisasi adalah sebesar 13.302,315 kWatt pada musim kering dan 143.551,645 kWatt pada musim hujan. Daya listrik yang dihasilkan PLTA saat ini adalah sebesar 13.302,315 kWatt pada musim kering dan 114.000 kWatt pada musim hujan. Sehingga daya listrik yang dihasilkan PLTA setelah dioptimalisasi mengalami kenaikan dari daya listrik sebelum dioptimalisasi sebesar 29.551,645 kWatt. Karena kenaikan daya melebihi kapasitas generator PLTA saat ini, maka terjadi penambahan 1 generator 30.000 kWatt atau 30 MW. [EN] In the dry season, Koto Panjang Hydroelectric Power Plant has operated one turbine and generator unit so the power produced is not optimal. In the same season, this hydropower plant has also operated three turbines and generators but only produces  35 MW of electricity by percentage  50% which is  30,702 % of the maximum power from operating three turbine and generator units. The purpose of this research is to determine the mainstay discharge of Koto Panjang Hydroelectric Power Plant, optimization will be used for Koto Panjang hydroelectric power plant, power can produce from its optimization and its comparison. The Penman empirical method was used to calculate the evaporation value. The mainstay discharge for hydropower plant outflow discharge at this time and after being optimized is calculated using the electrical power formula and the mass curve method. Furthermore, the hydroelectric power plant outflow discharge has obtained is analyzed in the water balance table using the sequent peak analysis method. The results obtained are the current mainstay discharge of hydroelectric power plant and after optimization, which are 305,319 m3/s and 384,465 m3/s with a percentage of 51,995% and 39,235%. Optimization is done by adjusting the outflow discharge to the volume of water in the storage at that time. The electric power after optimization is 13.302,315 kWatt in the dry season and 143.551,645 kWatt in the rainy season. The current electricity generated by hydroelectric power plant is 13.302,315 kWatt in the dry season and 114.000 kWatt in the rainy season. Therefore the electric power generated by hydroelectric power plant after optimization has increased from the electric power before it is optimized which is 29.551,645 kWatt. Because the increasing of the electric power exceeds the capacity of the current hydroelectric power plant generator, there is an addition 1 generator which is 30.000 kWatt or 30 MW.


2002 ◽  
Vol 122 (6) ◽  
pp. 989-994
Author(s):  
Shinichiro Endo ◽  
Masami Konishi ◽  
Hirosuke Imabayashi ◽  
Hayami Sugiyama

Author(s):  
Michal Kuchar ◽  
Adam Peichl ◽  
Milan Kucera ◽  
Jaromir Fiser ◽  
Pavel Kulik ◽  
...  

2014 ◽  
Vol 36 (1) ◽  
pp. 53-60 ◽  
Author(s):  
Maciej Korczyński ◽  
Ewa Krasicka-Korczyńska

Abstract Cypripedium calceolus is considered an endangered species in the territory of Poland. Population of this rare species, situated at Lake Kwiecko (Western Pomerania), was regularly monitored in the years 1986-2013. The studied population has been under the permanent influence of the nearby hydroelectric power plant for almost 45 years. The field observations showed that the power plant had no negative impact on the condition of Cypripedium calceolus population. An indication of its good condition was, among others, an increase in the size - from 150 to 350 specimens within the study period.


Sign in / Sign up

Export Citation Format

Share Document