Test results of asynchronized turbogenerator T3FAU-160 obtained at heat electric power station-21 (OAO Mosenergo)

2010 ◽  
Vol 81 (2) ◽  
pp. 62-66 ◽  
Author(s):  
I. Ya. Dovganyuk ◽  
A. Yu. Markov ◽  
V. P. Sokur ◽  
I. V. Fedorov
Atomic Energy ◽  
1993 ◽  
Vol 74 (6) ◽  
pp. 478-481 ◽  
Author(s):  
T. A. Goryachenkova ◽  
F. I. Pavlotskaya ◽  
I. E. Kazinskaya ◽  
K. V. Barsukova ◽  
V. V. Emel'yanov ◽  
...  

1969 ◽  
Vol 95 (2) ◽  
pp. 293-303
Author(s):  
R. Fred Gray ◽  
J. Ben Stephenson

2015 ◽  
Vol 5 (1) ◽  
pp. 62-70 ◽  
Author(s):  
Mikhail I. BAL’ZANNIKOV

The earth dam of run-of-river unit - Kuybishevskaya hydro-electric power station on Volga - is viewed. The main characteristics of earth dam, particularities of its construction and exploitation are presented. The factors that have changed initial design specifications of its exploitation are highlighted. Evaluation of geometrics of earth dam in different exploitation periods and potential causes of their tolerance are analyzed. Measures for exploitation reliability growth are proposed.


Sign in / Sign up

Export Citation Format

Share Document