scholarly journals Cost Estimate and Input Energy of Floor Systems in Low Seismic Regions

2022 ◽  
Vol 71 (2) ◽  
pp. 2159-2173
Author(s):  
Sayed Mahmoud ◽  
Alaa Salman
PCI Journal ◽  
1997 ◽  
Vol 42 (2) ◽  
pp. 20-23 ◽  
Author(s):  
John Stanton ◽  
William C. Stone ◽  
Geraldine S. Cheok
Keyword(s):  

2009 ◽  
Vol 12 (-1) ◽  
pp. 95-103
Author(s):  
Jacek Zabielski ◽  
Piotr Bogacz

2020 ◽  
pp. 127-129
Author(s):  
Ž. P. Cuckič

At the end of a decade-long research work at the Moravamont plant in Gnjilane, a new completely prefabricated building system was created from reinforced concrete and prestressed precast elements on the track, which was called Moravamont 2000. Presented in paper final results demonstrates that the construction is well and rationally designed, that the construction behaviour for the maximum expected earthquake effects with a return period of 500 years, according to the criterion of regulation, is resistant and resistant to an earthquake without major damage.


Sign in / Sign up

Export Citation Format

Share Document