ScienceGate
Advanced Search
Author Search
Journal Finder
Blog
Sign in / Sign up
ScienceGate
Search
Author Search
Journal Finder
Blog
Sign in / Sign up
Evaluation of Concrete Models in LS-DYNA to Develop a MASH Test Level 6 (TL-6) Barrier System: Phase I
University of Nebraska-Lincoln Data Repository
◽
10.32873/unl.dr.20201128.2
◽
2021
◽
Author(s):
Jennifer Rasmussen
◽
Yong-Rak Kim
Keyword(s):
Phase I
◽
Test Level
◽
System Phase
Start Chat
Download Full-text
Related Documents
Cited By
References
Program plan for the Brayton isotope power system. Phase I. design, fabrication and test of the Brayon isotope power system
10.2172/6360750
◽
1975
◽
Author(s):
Keyword(s):
Power System
◽
Phase I
◽
Program Plan
◽
System Phase
Start Chat
Download Full-text
Reliability program plan for the Isotope Brayton Ground Demonstration System (phase I)
10.2172/7129628
◽
1975
◽
Author(s):
Keyword(s):
Phase I
◽
Program Plan
◽
System Phase
Start Chat
Download Full-text
Automated Air Information Production System. Phase I. Volume IV. Charting Subsystem.
10.21236/ada076107
◽
1979
◽
Author(s):
J. Late
◽
A. DiPasqua
Keyword(s):
Phase I
◽
Production System
◽
Information Production
◽
System Phase
Start Chat
Download Full-text
Design of automatic recycling system Phase I
2020 Congreso Internacional de Innovación y Tendencias en Ingeniería (CONIITI)
◽
10.1109/coniiti51147.2020.9240224
◽
2020
◽
Author(s):
Jose Leon Leon
◽
Pablo Ospina
◽
Sergio Stiven Parra
◽
David Cortes Games
◽
Fredy Alejandro Murillo
Keyword(s):
Phase I
◽
Recycling System
◽
System Phase
Start Chat
Download Full-text
Line-focus solar central power system, Phase I. Final report, 29 September 1978 to 30 April 1980. Volume III. Appendices
10.2172/6709283
◽
1980
◽
Author(s):
A J Slemmons
Keyword(s):
Power System
◽
Phase I
◽
Final Report
◽
Line Focus
◽
System Phase
Start Chat
Download Full-text
BOA: Asbestos pipe-insulation removal robot system. Phase I. Topical report, November 1993--December 1994
10.2172/211314
◽
1995
◽
Author(s):
H. Schempf
◽
J.E. Bares
Keyword(s):
Phase I
◽
Robot System
◽
Pipe Insulation
◽
System Phase
Start Chat
Download Full-text
Central receiver solar thermal power system. Phase I. Volume II. Specifications
10.2172/6944814
◽
1975
◽
Author(s):
Not Given Author
Keyword(s):
Power System
◽
Phase I
◽
Thermal Power
◽
Solar Thermal
◽
Solar Thermal Power
◽
Central Receiver
◽
Thermal Power System
◽
System Phase
Start Chat
Download Full-text
Solar central receiver hybrid power system, Phase I. Volume 3. Appendices. Final technical report, October 1978-August 1979
10.2172/5197247
◽
1979
◽
Author(s):
Keyword(s):
Power System
◽
Phase I
◽
Hybrid Power System
◽
Hybrid Power
◽
Central Receiver
◽
Technical Report
◽
System Phase
Start Chat
Download Full-text
Sperry Low Temperature Geothermal Conversion System, Phase I and Phase II. Final report. Volume VI. Economic studies
10.2172/5228694
◽
1983
◽
Author(s):
C. Harvey
Keyword(s):
Low Temperature
◽
Phase I
◽
Phase Ii
◽
Final Report
◽
Conversion System
◽
Economic Studies
◽
System Phase
Start Chat
Download Full-text
High COP Heat Pump System. Phase I. Results. Technical report No. 1
10.2172/6261252
◽
1979
◽
Keyword(s):
Phase I
◽
Heat Pump
◽
Pump System
◽
Heat Pump System
◽
Technical Report
◽
System Phase
Start Chat
Download Full-text
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close