scholarly journals Load Distribution In Adjacent Precast "Deck Free" Concrete Box-Girder Bridges

Author(s):  
Waqar Khan

Bridges built with adjacent precast, prestressed concrete box-girders are a popular and economical solution for short-span bridges because they can be constructed rapidly. The top flanges of the precast box girders form the bridge deck surface. A shear key is introduced between the adjacent boxes over the depth of the top flange (i.e. 225 mm thick as the thickness of the box's top flange). Canadian Highway Bridge Design Code, CHBDC specifies empirical equations for the moment and shear distribution factors for selected bridge configurations but not for adjacent precast concrete box-girder bridge type. In this study, a parametric study was conducted, using the 3D finite-element modeling, and a set of simplified equations for the moment, shear and deflection distribution factors for the studied bridge configuration was developed.

2021 ◽  
Author(s):  
Waqar Khan

Bridges built with adjacent precast, prestressed concrete box-girders are a popular and economical solution for short-span bridges because they can be constructed rapidly. The top flanges of the precast box girders form the bridge deck surface. A shear key is introduced between the adjacent boxes over the depth of the top flange (i.e. 225 mm thick as the thickness of the box's top flange). Canadian Highway Bridge Design Code, CHBDC specifies empirical equations for the moment and shear distribution factors for selected bridge configurations but not for adjacent precast concrete box-girder bridge type. In this study, a parametric study was conducted, using the 3D finite-element modeling, and a set of simplified equations for the moment, shear and deflection distribution factors for the studied bridge configuration was developed.


2010 ◽  
Vol 163-167 ◽  
pp. 3551-3554
Author(s):  
Wei Peng ◽  
Zhi Xiang Zha

This template Based on cracks observation and finite element analysis of real engineering projects as well as bridge load test after reinforcement, causes and types of cracks in prestressed concrete box girder bridges and treating measurements are systematically studied. The results obtained from the calculation are presented to demonstrate the effect of sensitive factors, such as arrangement of longitudinal prestressed tendons, the magnitude of vertical prestressed force, temperature gradient, etc. The results show that the arrangement of longitudinal prestressed tendons and the magnitude of vertical prestressed force take key roles in cracks control of box girder webs. Lots of treating measurements are presented in accordance with different types of cracks, some of them are applied to a reinforcement engineering of a long span pretressed concrete continuous box girder bridge with cracks. Load test after reinforcement of the bridge demonstrates the reasonability of the treating measurements. Several design recommendations and construction measures about reinforcements and some sensitive factors mentioned above are proposed to control cracks.


2020 ◽  
Vol 2020 ◽  
pp. 1-11
Author(s):  
Hanzheng Xu ◽  
Xiaofeng Yan

Concrete box-girder bridges are widely used in China. During several routine inspections of two-year-old highway bridges of this type in the China Central Plains region, we found that transverse cracks are widespread on the bottom flanges of those box girders, mainly distributed in the area of 1/4L to 3/4L of the span. Selected cracks were then monitored continuously for one year. Our results showed that there had been no change in the widths of the cracks, but their lengths had increased and new cracks had formed. Taking into consideration factors like hydration reaction, relative humidity difference, shrinkage and creep, sunlight thermal differential effect, sudden temperature change, vehicle load, and their combined efforts, we have developed spatial structural models and conducted stress analyses on the reinforced concrete and prestressed concrete box-girder bridges, respectively. Our numerical analysis results indicated that the hydration reaction is the main reason for the initial bottom flange crack and the temperature difference between the inside and the outside of the box girders caused the crack developments at the later stage.


Sign in / Sign up

Export Citation Format

Share Document