Research on Precast Segment Assembling Bridge Technology in Short-Line Matching Method
2012 ◽
Vol 256-259
◽
pp. 1652-1657
Keyword(s):
Targeted at key technological difficulties of pre-stressed concrete bridge with precast segment assembling in short-line matching method, combined with the as-built projects and those under construction, this essay introduces systematic segmental precast assembly externally prestressed concrete construction technology in short-line matching method, and the developed serial complete equipments set, thus realizing development trend of factory-orientation, large-scale, mechanization, standardization of modern bridge construction.
2014 ◽
Vol 1065-1069
◽
pp. 912-918
2013 ◽
Vol 671-674
◽
pp. 1729-1731
2012 ◽
Vol 256-259
◽
pp. 1548-1553
◽
Keyword(s):
Keyword(s):
Replacement Construction Technology Analysis of Half-Through Reinforced Pipe Concrete Bridge Derrick
2014 ◽
Vol 1065-1069
◽
pp. 949-955
Keyword(s):
Keyword(s):
2014 ◽
Vol 638-640
◽
pp. 1586-1590
Keyword(s):
2014 ◽
Vol 556-562
◽
pp. 675-678