Research on the Load on Cutter Head of Hard Rock Tunnel Boring Machine

2014 ◽  
Vol 684 ◽  
pp. 303-307 ◽  
Author(s):  
Xiao Xu Zhao ◽  
Ya Dong Gong

Study on the load exerted on cutter head is very useful for the design and performance prediction of hard rock tunnel boring machines. A composite model based on smoothed particle hydrodynamics and finite element method was carried out using AUTODYN software to study the rock fragmentation mechanism of constant cross-section disk cutters in cutter head. The normal force, rolling force and side force on the disk cutters with different cutter radius were researched in the numerical simulation study. The results were verified by historical literature data. To obtain the distribution of the forces with different cutter radius, the loading of cutter head of a Ф5.75 hard rock tunnel boring machine were analyzed. The result shows that it is useful for cutter head’s design and its layout optimization.

2019 ◽  
Vol 26 (4) ◽  
pp. 175-189
Author(s):  
Lucas Kwan Lok Chan ◽  
Alan Kwok Lun Kwong

The Tuen Mun – Chek Lap Kok Link (TM-CLKL) project implemented latest innovation designs and ground improvement techniques in large slurry tunnel boring machines (TBM) tunnelling for constructing the sub-sea TBM tunnel in Hong Kong. Face stability, ground settlement, blow out, water ingress and ovalisation are always the major geotechnical risks for TBM tunnelling in the industry. This paper summarises the design considerations in terms of ground improvement and special arrangements of TBM tunnelling to mitigate the geotechnical risks and the improvement of the overall performance of TBM tunnelling under the TM-CLKL project. Field monitoring data such as surface settlement, ovalisation of segmental lining and ground improvement technique such as barrettes are presented.


2021 ◽  
pp. 108-118
Author(s):  
Wilson W S Mok ◽  
Andrew S W Ng

In this paper, the history of pipejacking works by tunnel boring machines in Hong Kong, their development, selection of design method and tunnel boring machine (TBM), operations, length and alignment of a pipeline, types of techniques to suit different site constraints and ground conditions, and performance of the works are discussed. This paper should be read together with part II, which covers applications, problems encountered, cost and prospects.