DEVELOPMENT OF A PLAN OF CORRECTIVE AND PREVENTIVE ACTIONS FOR IMPROVING PRODUCTION PROCESSES ON THE EXAMPLE OF REINFORCED CONCRETE PILES (FMEA-ANALYSIS)
1988 ◽
Vol 390
(0)
◽
pp. 114-124
Keyword(s):
2002 ◽
Vol 67
(555)
◽
pp. 107-114
◽
Keyword(s):
2012 ◽
Vol 446-449
◽
pp. 1884-1887
Keyword(s):
1935 ◽
Vol 1
(2)
◽
pp. 203-234
2013 ◽
Vol 49
◽
pp. 123-133
◽