Implementation of a PTAS for Scheduling with Release Dates
Keyword(s):
2015 ◽
Vol 247
(3)
◽
pp. 797-803
◽
Keyword(s):
2013 ◽
Vol 40
(7)
◽
pp. 1758-1765
◽
Keyword(s):
A Branch-and-Bound procedure to minimize total tardiness on one machine with arbitrary release dates
2004 ◽
Vol 158
(3)
◽
pp. 595-608
◽
2012 ◽
Vol 66
(9-12)
◽
pp. 2063-2074
◽
2018 ◽
pp. 331-348
◽
Keyword(s):
2016 ◽
Vol 116
(8)
◽
pp. 503-507
◽
2002 ◽
Vol 30
(4)
◽
pp. 276-280
◽
Keyword(s):