Investment Incentives in Turkey

Author(s):  
Ismail Arslan
2019 ◽  
Author(s):  
Shaowei Ke ◽  
Yao Lu ◽  
Xinzheng Shi ◽  
Yeqing Zhang

2020 ◽  
Author(s):  
Mohammad Akbarpour ◽  
Scott Duke Kominers ◽  
Shengwu Li ◽  
Paul R. Milgrom

2021 ◽  
pp. 0958305X2199229
Author(s):  
Jingyu Qu ◽  
Wooyoung Jeon

Renewable generation sources still have not achieved economic validity in many countries including Korea, and require subsidies to support the transition to a low-carbon economy. An initial Feed-In Tariff (FIT) was adopted to support the deployment of renewable energy in Korea until 2011 and then was switched to the Renewable Portfolio Standard (RPS) to implement more market-oriented mechanisms. However, high volatilities in electricity prices and subsidies under the RPS scheme have weakened investment incentives. In this study we estimate how the multiple price volatilities under the RPS scheme affect the optimal investment decisions of energy storage projects, whose importance is increasing rapidly because they can mitigate the variability and uncertainty of solar and wind generation in the power system. We applied mathematical analysis based on real-option methods to estimate the optimal trigger price for investment in energy-storage projects with and without multiple price volatilities. We found that the optimal trigger price of subsidy called the Renewable Energy Certificate (REC) under multiple price volatilities is 10.5% higher than that under no price volatilities. If the volatility of the REC price gets doubled, the project requires a 26.6% higher optimal investment price to justify the investment against the increased risk. In the end, we propose an auction scheme that has the advantage of both RPS and FIT in order to minimize the financial burden of the subsidy program by eliminating subsidy volatility and find the minimum willingness-to-accept price for investors.


1962 ◽  
Vol 15 (2) ◽  
pp. 198-204
Author(s):  
E. CARY BROWN

2018 ◽  
Vol 8 (10) ◽  
pp. 1978 ◽  
Author(s):  
Jaber Valinejad ◽  
Taghi Barforoshi ◽  
Mousa Marzband ◽  
Edris Pouresmaeil ◽  
Radu Godina ◽  
...  

This paper presents the analysis of a novel framework of study and the impact of different market design criterion for the generation expansion planning (GEP) in competitive electricity market incentives, under variable uncertainties in a single year horizon. As investment incentives conventionally consist of firm contracts and capacity payments, in this study, the electricity generation investment problem is considered from a strategic generation company (GENCO) ′ s perspective, modelled as a bi-level optimization method. The first-level includes decision steps related to investment incentives to maximize the total profit in the planning horizon. The second-level includes optimization steps focusing on maximizing social welfare when the electricity market is regulated for the current horizon. In addition, variable uncertainties, on offering and investment, are modelled using set of different scenarios. The bi-level optimization problem is then converted to a single-level problem and then represented as a mixed integer linear program (MILP) after linearization. The efficiency of the proposed framework is assessed on the MAZANDARAN regional electric company (MREC) transmission network, integral to IRAN interconnected power system for both elastic and inelastic demands. Simulations show the significance of optimizing the firm contract and the capacity payment that encourages the generation investment for peak technology and improves long-term stability of electricity markets.


Sign in / Sign up

Export Citation Format

Share Document